
- Entrepreneur
- Trans Israel
- Services
- Project Management
- Main elements
- Construction of a grade-separated pedestrian and cyclist overpass adjacent to Sammy Ofer Stadium, providing a safe multimodal crossing above Route 4 (east-west). The structure will be designed to accommodate both pedestrian and bicycle traffic in accordance with advanced engineering standards, serving as an architectural gateway for southern ingress into Haifa.
- Project estimation
- NIS 30 million
